Hi, My server is Dell R410 and this Hardware have one controller and driver this controller was moved for the new version Centos8, AlmaLinux, RockLinux. Look Bellow what i do to install AlmaLinux into the Dell R410.
Hi, My server is Dell R410 and this Hardware have one controller and driver this controller was moved for the new version Centos8, AlmaLinux, RockLinux. Look Bellow what i do to install AlmaLinux into the Dell R410.